US 117 Road Widening

 

Fast Facts

Project # U-2714
Type: Road Widening
Affected Counties: Wayne
Estimated Cost: $15,647,000

Yes, send me DOT project updates!

Description

The North Carolina Department of Transportation (NCDOT) plans to widen a 1.5-mile stretch of U.S. 117 (North William Street) in Goldsboro (Wayne County).

The widening will commence at U.S. 70 Bypass and end at Tommy’s Road just south of Hwy 44.

The project on U.S. 117 (North William Street) is designed to eliminate the bottleneck section of road between Hwy 44 and the new U.S. 70 Bypass interchange. Currently, the road narrows from five lanes down to two lanes, then expands to four lanes.

Map

Project Schedule

  • Right-of-way – 2017
  • Construction begins – 2018
  • Construction ends – 2019

Property Takings

It is estimated that more than 85 parcels of land will be impacted by this project. Currently, the DOT has set aside $997,000 for right-of-way takings. If your property will be affected, contact one of our attorneys (four of whom previously worked on behalf of the NCDOT) for a free case evaluation.

Get a free case
evaluation today.

There are only a handful of attorneys in NC who practice eminent domain exclusively, and even fewer with NCDOT experience. We have six. That’s why it’s worth getting in touch with us for a free case evaluation.

Here’s how it works:

1) Tell us about your situation.

2) We research your property as needed, using DOT maps, our own technology, and experience to see the exact effects.

3) We will give you our professional evaluation of your legal situation and recommend next steps. This evaluation is free, and there’s no pressure or obligation to hire us after.

But please don’t wait to act. Waiting can hurt your case, and the cost is the same: free.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

* Indicates required information