Hanes Mill Road Widening

Fast Facts

NCDOT TIP # U-2729
Project Type:
 Road widening
Affected Counties:
 Forsyth
Estimated Cost: $
 11,105,000

Description

The North Carolina Department of Transportation (NCDOT) plans to widen Hanes Mill Road in Winston-Salem to two lanes in each direction with additional turning lanes. Widening will span a half-mile stretch from Museum Drive to University Parkway. Two lanes will be added from the furniture plant at Museum Drive to Summit Square Boulevard on the east side of University Parkway. Medians will separate the traffic flow.

The purpose of the project is to better accommodate traffic flow on both Hanes Mill Road and University Parkway.

News/Publication

Schedule

  • Right-of-way acquisition – 2019
  • Start Construction – 2020
  • End Construction – 2021

Property Takings

It is estimated that over 20 parcels of property will be impacted by this project. Currently, the NCDOT has set aside $2,576,000 for right-of-way takings. If your property will be affected, contact one of our attorneys (four of whom previously worked on behalf of the NCDOT) for a free case evaluation.

Get a free case
evaluation today.

There are only a handful of attorneys in NC who practice eminent domain exclusively, and even fewer with NCDOT experience. We have several. That’s why its worth getting in touch with us for a free case evaluation.

Here’s how it works:

1) Tell us about your situation.

2) We research your property as needed, using DOT maps, our own technology, and experience to see the exact effects.

3) We let you know what we think a fair offer would be. This evaluation is free, and there’s no
pressure or obligation to hire us after.

But please don’t wait to act. Waiting can hurt your case, and the cost is the same: free.

"*" indicates required fields

* Indicates required information

This field is for validation purposes and should be left unchanged.