NC 42 Tar River Bridge Replacement
Fast Facts
Project # B-4932
Type: Bridge replacement
Affected Counties: Edgecombe
Estimated Cost: $6,375,000
Description
The North Carolina Department of Transportation (NCDOT) will replace the NC 42 Tar River Bridge (#28) in in Edgecombe County.
According to NCDOT Bridge Information, this bridge carries a safety rating of 45.86 out of 100. Although it was built in 1952, it is not currently considered structurally deficient or functionally obsolete.
Map (Project Location)
Project Schedule
- Right-of-way acquisition – Late 2016
- Start Construction – 2017
- End Construction – 2018
Property Takings
Currently the NCDOT has set aside $1,000,000 for right-of-way takings. If your property will be affected, contact one of our eminent domain attorneys (two of whom previously represented the NCDOT) for a free case evaluation, or call 1-877-393-4990.